Home

About

Circle

Division

Tariff Structure

Staff

Sitemap

T.E.R.C

Other Site

Complaint

Telephone No

PART - II

Tariff & Charges

<<Page 1

Category

Tariff ID

Category of consumers

Monthly consumption in KWH

Rate per KWH

Monthly minimum charge

Net (Rs.)

Rebate (Rs.)

Gross (Rs.)

1

2

3

4

5

6

7

8

A.DOMESTIC

 

 

 

 

 

 

 

 

 

a.

10100

Single phase S/Connection

Kutirjyoti connection or similar connection under any scheme of the State Govt. or Central Govt. for the benefit or poorer section. Load (maximum 2 (two) light points only).

 

Load 60W x 2 - 120 Watt.

Rs. 20/- per month per connection. In case the consumer increase the load, it will fall under the Category-A and tariff will be as in (b), (c) & (d) etc. as the case may be in accordance with the connected load. In this regard decision of the SDO (E) concerned is final.

b.

10200

Connection having Light & Fan etc.

Load : 0-250 W

All Units

1.50

 

 

0.10

 

24

1.60

 

 

Rs. 36.00 per month

c.

10300

Connection having Light, Fan, TV & Radio etc.

Load : above 250 W & upto 500 W

All Units

1.60

 

 

0.10

 

48

1.70

 

 

Rs. 77.00 per month

d(i).

10401

Connection having Light, Fan, TV, Radio, Iron Plug, Refrigerator etc.

Load : above 500 W & upto 750 W

All Units

1.80

 

 

0.10

 

72

1.90

 

 

Rs. 130.00 per month

d(ii).

10402

Connection having Light, Fan, TV, Radio, Iron Plug, Refrigerator etc.

Load : above 750 W & upto 1000 W

All Units

2.00

 

 

0.10

 

96

2.10

 

 

Rs.192.00 per month

e(i).

10501

Connection having Light, Fan, TV, Radio, Iron Plug, Refrigerator, Heater, Cooler etc.

 

Load : above 1000 W & upto 1500 W

All Units

2.20

 

 

0.10

 

144

2.30

 

 

Rs. 317.00 per month

e(ii).

10502

Connection having Light, Fan, TV, Radio, Iron Plug, Refrigerator, Heater, Cooler etc.

 

Load : above 1500 W & upto 2000 W

All Units

2.40

 

 

0.10

 

192

2.50

 

 

Rs. 460.00 per month

f.

10600

3-Phase S/connection

 

Load : above 2 KW & upto 5 KW

All Units

2.70

 

 

0.10

 

96 x KW

2.80

 

 

Rs. 260.00 per month / KW or part.

g.

10700

3-Phase S/connection

 

Load : above 5 KW

All Units

3.00

 

 

0.10

 

96 x KW

3.10

 

 

Rs. 288.00 per month / KW or part.

Applicable : The consumers those are having connection from Diesel Power Source will be charged @ Rs. 200.00 per KW or part extra per month in addition to normal charge.

B.COMMERCIAL

 

 

 

 

 

 

a.

20100

Single phase S/Connection  Light & Fan etc.

Load : 0-300 W

All Units

2.20

 

 

0.10

 

33

2.30

 

 

Rs. 73.00 per month

b.

20200

Light, Fan & TV etc.

Load : above 300 W & upto 500 W

All Units

2.50

 

 

0.10

 

55

2.60

 

 

Rs. 137.00 per month

c.

20300

Light, Fan, TV & Refrigerator etc.

Load : above 500 W & upto 1000 W

All Units

2.90

 

 

0.10

 

110

3.00

 

 

Rs. 319.00 per month

d.

20400

Light, Fan, TV & Refrigerator etc.

Load : above 1000 W & upto 2000 W

All Units

3.20

 

 

0.10

110 x KW

3.30

 

 

Rs. 352.00 per month / KW or part

e.

20500

3-Phase S/Connection

Light, Fan, TV & Refrigerator etc.

Load : above 2 K W & upto 5 KW

All Units

3.70

 

 

0.10

110 x KW

3.80

 

 

Rs. 407.00 per month / KW or part

f.

20600

Light, Fan, TV & Refrigerator etc.

Load : above 5 KW

All Units

4.00

 

 

0.10

110 x KW

4.10

 

 

Rs. 440.00 per month / KW or part

g.

20700

When a group of consumers not less than 10 nos. under a common roof require supply of power above 2 KW for commercial business centre like Hawkers' Corner, Battala Super Market, Maharajganj Bazar etc. where independent connection is not technically feasible the authorised officer shall provide 3-phase connection in each premises.

 

Load : above 2 KW

All Units

3.70

 

 

 

0.10

 

110 x KW

3.80

 

 

 

Rs. 407.00 per month / KW or part thereof.

Applicable : The consumers those are having connection from Diesel Power Source will be charged @ Rs. 200.00 per KW or part extra per month in addition to normal charge.

C. IRRIGATION

 

 

 

a.

 

30100

 

Single / Three Phase.

Motive power for irrigation.

 

Load : upto 5 H.P.

All Units

0.75

 

 

0.10

 

48 x HP

0.85

 

 

(i) Rs. 36.00 per month per HP or part from October to March.

 

(ii) Rs. 18.00 per month per HP or part from April to September.

 

Power consumption for light & fans in Pump Houses shall be metered separately and charged at the rate prescribed for commercial purpose under category B).

b.

 

30200

 

Three Phase.

Motive power for irrigation.

 

Load : above 5 H.P.

All Units

 

1.20

 

 

 

0.10

 

48 x HP

 

1.30

 

 

 

i) Rs. 58.00 per month per HP or part from October to March.

 

(ii) Rs. 29.00 per month per HP or part from April to September.

 

(Power consumption for light & fans in Pump Houses shall be metered separately and charged at the rate prescribed for commercial purpose under category B).

N. B. : For Shallow Tube Wells supply at 11 KV can be provided on specific requisition but the subsequent LT line extension & maintenance will be the responsibility of the group of consumers or a Co-operative if so formed.

 

D. WATER WORKS

 

a.

 

40100

Single / Three Phase.

Motive power for water works.

 

Load : 1 H.P. and above.

All Units

 

1.60

 

 

0.10

 

48 x HP

1.70

 

 

Rs. 76.00 per month per HP or part

(Power consumption for light 7 fans in Pump Houses shall be metered separately and charged at the rate prescribed for commercial purpose under category B).

E. INDUSTRIAL

 

 

 

a.

50100

Single / Three Phase.

Motor & other industrial appliances, Battery Charges, Welding Transformer etc.

 

Load : upto 5 H.P.

All Units

2.00

 

 

0.10

 

49 x HP

2.10

 

 

Rs. 98.00 per month per HP or part

b.

50200

Motor & other industrial appliances, Battery Charges, Welding Transformer etc.

 

Load : above 5 H.P. & upto 20 H.P.

All Units

2.40

 

 

0.10

 

49 x HP

2.50

 

 

Rs. 118.00 per month per HP or part

c.

50300

Motor & other industrial appliances, Battery Charges, Welding Transformer etc.

 

Load : above 20 H.P. & upto 100 H.P.

All Units

2.70

 

 

0.10

 

49 x HP

2.80

 

 

Rs. 132.00 per month per HP or part

d.

50400

Motor & other industrial appliances, Battery Charges, Welding Transformer etc.

 

Load : above 100 H.P.

All Units

3.40

 

 

0.10

 

49 x HP

3.50

 

 

Rs. 166.00 per month per HP or part

F. TEA, COFFEE

     & RUBBER

     GARDEN

 

a.

 

60100

 

Single / Three Phase.

Load : all loads of the factory & irrigation of the estate.

 

All Units

 

3.40

 

0.10

 

3.50

Rs. 210 per month per HP or part

Power consumption for lights & fans in an around the factory premises shall be metered separately & charged at the rate prescribed for commercial purpose under category B).

N. B. : All consumers under Category - Industrial, Tea / Coffee / Rubber Garden & Irrigation will be entitled to get 30% concession of the existing tariff under respective category of consumers for operation of motive powers during off peak hours. TOD meter will be supplied and installed by the department on request of the consumer for which monthly rent will be charged. The OFF PEAK HOURS is 2200 to 0500 hours of the following day.

G. BULK SUPPLY

 

a.

70100

Bulk Supply

 

Mixed load.

All Units

3.40

0.10

3.50

Rs. 262.00 per KVA per month
(i) With metering at 11 / 33 KV side.

(ii) If the metering is at LT. 3% transformation loss to be added.

b.

70200

Interstate Tariff

This will be guided on mutual agreement.

H. PUBLIC LIGHTING a. 80100 Supply of Power for Public Lighting system for Streets, Road, Lanes & Parks etc. 1. Panchayet

2. Nagar Panchayet & Municipal Area

1.50

2.00

 

0.10

0.10

 

1.60

2.10

 

Rs. 225.00 per month per KW

Rs. 300.00 per month per KW

N. B. : 1.  The contracted lead shall be 60% of the connected load in case of domestic category and 80% in case of all other categories. The assessment shall accordingly be made by the concerned SDO (E). For Irrigation & Water Works consumers, the connected load shall be considered excluding the capacity of the stand by motors.
N. B. : 2.  BILLING:  In case the meter is tampered / meter seal broken / meter stop / reading unreasonable then the quarterly consumer bill shall be made on the basis of last 3 (three) months average reading.

FUEL COST ADJUSTMENT (FCL) :-

i.    The fuel cost adjustment charge is merged in the revised tariff wef. 1.7.2003 on all the category of consumers.

ii.    The price of fuel (i.e. Gas, Diesel etc.) is revised by the Govt. of India from time to time inevitably leading to increase of unit cost of Generation of Electricity. As is done in most of the States, the State Govt. has decided that in order to neutralize this price increase in fuel (i.e. Gas & Diesel), the unit charge of electricity tariff now payable by the consumers shall proportionately be increased by adding extra fuel charge as and when it may occur in future.